Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit-add-ons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/teamarch/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/teamarch/public_html/wp-includes/functions.php on line 6131
ZEHNERIA PORTICO HOTEL - TEAM 2 ARCHITECTS

ZEHNERIA PORTICO HOTEL

ZEHNERIA PORTICO HOTEL

CLIENT: ZEHNERIA PORTICO LTD

PROJECT COST: KES 65 MILLION

YEAR OF COMPLETION: 2017

The hotel is located in close proximity to the shopping malls and office blocks. An Exciting and challenging project, this involved the total refurbishment of the bar area, swimming pool and the dining area. Working along side various consultants we were able to interpret the hotel’s vision and execute all the individual elements which emphasizes the identity of the hotel.

The hotel will also inaugurate a new bar and pool area which emphasizes the local materials and Swahili features.

The finish and attention to the details are well executed to ensure the hotel was able to realize the level of sophistication, quirkiness and spirit required by their discerning clientele.