Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit-add-ons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/teamarch/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/teamarch/public_html/wp-includes/functions.php on line 6131
RESIDENTIAL DEVELOPMENT ON STATEHOUSE RD, NAIROBI. - TEAM 2 ARCHITECTS

RESIDENTIAL DEVELOPMENT ON STATEHOUSE RD, NAIROBI.

STATE HOUSE RD. DEVELOPMENT

PROJECT COST: KES 2 BILLION

These executive apartments are situated in the very high profile area of Nairobi in close proximity to the State House. The design has been approached to project a unique expression of sustainable design. The building enhances classic architecture with contemporary technology. The functional disposition of various spaces portrays clever solution to fit in the requirements which creates an environment that’s draws us into a subtle flow into the nature